On the Day of Handover
Before Leaving
Carry the following items
- Owner/GPA identification card taking the handover
- Cheque Book, if you wish to start interiors soon
- Torch (Optional)
- Measuring tape (Optional)
- Water Bottle
- Mats if someone coming along might not be able to stand for long in the flat.
- Come prepared to stay at site for atleast 2 hours.
At the Marketing Office of Brigade Utopia
- Reach the office on time and ask for Goverdhan/Vishwanath at the reception
- Let them know your block and flat's handover planned for the day. Ensure you mention the Block (Eden/Serene), as flats names could be similar.
- The flat preparation starts and you will be taken there in some while.
At the flat
- A red carpet awaits you, you cut the red ribbon
- You will be then run through the flat features and various installations done by the Builder
Most Important : Your own inspection of the flat
- Once the Brigade representative is done showing you the flat, you should inspect the flat and spend ample time to get the snag list prepared.
- The list of things to check are listed below
Rooms
- Check the laying of tile and its unevenness, with footwear on walk scrapping the floor and see if you hit a tile notch, which might topple you.
- Check for Tile grouting gaps and ask for for filling them wherever found
- Tap the tiles wherever possible to check hollowness in base below.
- The wooden flooring may be laid unevenly or have gaps, there might be cracks in the wooden pieces, ask for fixing those issues
- Look for seepage/damps on the walls and cracks in the putty work if any.
- View the wall perpendicularly to see the paint patches.
- Confirm if the wall painting is done; not primer or just putty.
- Check for scratches/dents on the tiles/walls.
Bathrooms
- Check if the water flow is towards the outlet in the bathroom
- Check for stones in the commode
- Check for flush working fine.
- Keep the commode lid up and check it stays that way, should not fall down. If so, get it replaced.
- Check for the soft closing function of the commode lid
- Check the taps and shower
- Check the false ceiling.
- Check if the windows there close properly
- Since there wont be any power supply, use mobile torch to check the tiles in the bathroom
Kitchen
- Check for leakage from taps if any.
- Check if the kitchen water outlets are not blocked
- Check if the chinmey pipe exhaust core cutting is done proper and finished well.
- Check if the GAIL Pipe core cutting is seal around the pipe.
- Ask the builder representative to show the dedicated Grey/Black water outlets in the kitchen if provisioned.
Balcony
- Check if the tiles are clean and not broken.
- Check if the floor slope lets water flow towards the water outlet and doesn't stagnate
- Check for putty work cracks here too
- Check for the maintenance shaft being closed properly.
- Check the balcony door and if its sliding function is smooth
- Check if the sliding door locks are working and not very jammed to use.
- Check for cracks on the sliding door glass.
- Check if the railing is sturdy and fit properly
- Check for painting done on railing and rusting issues.
Doors
- The main door should be polished
- Main Door Frame being are installed correctly and not bulging. Remove the red carpet and check with torch if not having sufficient light there.
- Check the locks and see if they work with the keys well.
- Check the door handles are not overused, lose, rusted or having polish marks.
- Check for dents on the door/frames at all doors
- Check for brown wax work done on doors to hide damages.
Windows
- Check frame-wall gaps to avoid water seepage during rain
- Check glass for cracks
- Check the window panes close properly and locks right
- Check if the glass exterior is clean or not, ask when will they clean
Flat Exterior
- Check for cleanliness of flat exterior, no paan spits/different paint/cement/damages
- Check if the Gail pipe entry is sealed to prevent rainwater ingress
- Check if your window frames exteriors have the protective films removed
- Check for water logging in service bays outside your flat.
- Check the AC outlets are covered
Before leaving the flat
- Ensure the snaglist is noted in the handover acknowledgment doc and agreed to be fixed
- For there are fixes to be done, one key on Main Door shall be kept by the Builder to fix things
Before heading back to the Marketing Office
- Insist on being shown your parking slot, the letterbox and your Bescom Meter
- Ask to be shown the common amenities for your Block if possible.
Back at the Marketing Office
- You will be required to sign the handover acknowledgment
- Then the following items shall be handed over to you
- Copy of the Registered Sale Deed
- Possession Letter
- Car Parking Allotment Letter
- BESCOM NOC
- Copy of the handover acknowledgment you just signed
- Interior Guidelines and Work Permit form - You should ideally get the following keys
- Doors in the flat
- Keys for letterbox
- Keys for windows wherever such a provision is made - Ask for the Vehicle Stickers for you own a parking at the Estate Management Office
- Finally get an estimated timeline by when you snags shall be fixed, Follow ups are very much required for things to get done in time.